MWCC Capping Stack Demonstration Part 4

The MWCC 15k psi Capping Stack was lowered from the Laney Chouest into the water using the A-frame. A heave compensated landing system was used to lower the capping stack on a wire off of the back of the vessel onto the parking pile.