May 2012 News

MWCC May 2012 News

The riser upper gooseneck assembly is being prepared for hydrotesting at Vector International in the United Kingdom.


MWCC May 2012 News

The upper gooseneck assembly is being tested for tensioning at Vector International in the United Kingdom.


MWCC May 2012 News

Suction gravity pile number two at Technip Offshore in Finland prior to the addition of ROV interfaces.


MWCC May 2012 News

Top riser assembly/bottom riser assembly fabrication is underway at Isleburn in Invergordon, United Kingdom.


MWCC May 2012 News

Fabrication of the powered reel drive at Obled-Sacsum, Valenciennes, France.


MWCC May 2012 News

Phased array ultrasonic testing of the tether chain at Vicinay in Bilbao, Spain.


MWCC May 2012 News

Forging of the tether d-shackle at Vicinay Forging Plant in Galdames, Spain.


MWCC May 2012 News

Fabrication of the riser fairings at AIMS in Houston, Texas.


MWCC May 2012 News

Painting of the riser assembly frames.


MWCC May 2012 News

Fabrication of the top and bottom riser assembly.


MWCC May 2012 News

Testing of the buoyancy can vent and fill ‘hot stabs’ at OceanWorks in Houston.