December 2012 News

Portside main deck

Portside main deck of the Eagle Louisiana.


Buoyancy can

Buoyancy can lying in horizontal shipping and storage cradle.


Two gooseneck assemblies

Two gooseneck assemblies resting on cribbing awaiting to be transported.


Surveyors conducting dimensional elevation checks

Surveyors conducting dimensional elevation checks for verticality of the turret davit.


section of tether chain

A section of tether chain is inspected after being cooled by quenching.


Dual crane lift

Dual crane lift utilized to lift and set MSF-H floor decking onto a truss foundation.